Anchor Piles (1)

Project name : Lifting Anchor Piles
Location         : Batam, Indonesia
Year                 : April 2010

Cargo :
- 470te anchor piles Length 90 meter
 
In April 2010, Yew Choon was awarded the contract for lifting, transporting and shipping of 4 anchor piles at a fabrication yard in Kabil Port, Batam, Indonesia.
The piles, each weighing 470Te, had to be raised from ground level and transported out of the yard to the jetty area where they have to be rolled onto Yew Choon*s barge by means of RORO system.
For this operation, Yew Choon choose to use its 1100Te 4-Point Lift System for the lifting of the piles/2 sets of 12 axle Goldhofer SPT trailers for the transport and one of their 280ft barges with a 2400Hp tug for shipping the piles from Kabil Port, Batam to Tanjung Uncang, Batam.
 


 

Damen Shipyard (8) More..

Client name : Damen Shipyard
 
Shifting of vessel from one factory to another using Self-Propelled hydraulic Trailer at Damen Shipyard, Singapore .


 

Eclipse 1400Te of Deck House (4)

Project name : Eclipse 1400Te of Deck House
Location         : Batam, Indonesia
Period         : June 2009 - July 2009
 
Cargo
- 1 unit Module 每 1,400 Tons
- Dim: L 51.50 x W 32.67 x H 19.6m
 

Gas Services International (1)

Project name : AKER SMART 1 FPSO
Year                 : 2008


 

GSI-Deugro (1)

Project name : Transportation of 5 Units 289 Tons Gas Compressor from Singapore to Hazira, India
Year                 : 2005


 

Jacking and Shifting of Supply Vessel (4)

Project name : Jacking & shifting of Supply Vessel
Location         : Pelican Shipyard Singapore
Period         : July 2009
 
Cargo
- 1 unit H147 Boat 每 350 Tons
- Dim: L 55.0 x W 10.0 x H 10.0m

Supply Of Equipment
- 36 Axle lines Goldhofer PST/THP trailer


 

KPI Project (1)

OVERSIZED & HEAVYLIFT

Project name : KPI Project
Year                 : 2000


 

Land Transportation of 132 Units MRT Coaches (5) More..

OVERSIZED & HEAVYLIFT

Project name                  :        Land Transportation of 132 Units MRT Coaches
Location                          :        Bishan MRT Depot
Country                          :        Singapore
Operation Period          :        Jan 2011 每 Dec 2011
Cargoes to be transported     :           132 Units MRT Coaches


 

PIPA II Development Project (7) More..

Project name : PIPA II Development Project
Location         : Yew Choon Yard to Sembawang Shipyard Singapore
Period         : July 2009
 
Cargo
- 1 unit TG Module 每 302.70 Tons
- Dim: L 24.35 x W 12.05 x H 12.85m
- 1 unit TG Module 每 180.20 Tons
- Dim: L 15.37 x W 12.05 x H 12.85m
- 1 unit DG Module 每 727.00 Tons
- Dim: L 20.38 x W 18.80 x H 16.35m
- 1 unit Reel 每 125.00 Tons
- Dim: L 11.74 x W 8.71 x H 12.23m
- 1 unit E Module 每 162.80 Tons
- Dim: L 14.34 x W 6.00 x H 12.35m
- 1 unit E Module 每 180.80 Tons
- Dim: L 17.36 x W 6.00 x H 12.35m


 

PSR-1 Project (1)

OVERSIZED & HEAVYLIFT

Project name : PSR-1 Project
Year                 : 1993


 

Sea Transportation of Marine Straddle Carrier (6) More..

Project name : Sea Transportation of Marine Straddle Carrier
Location         : Singapore to Sekupang, Indonesia
Period         : November 2007
 
Cargo to be transported: 

- 1 unit 250 Tons

                                  SWL Marine Straddle Carrier

 

Shifting of 500TE Accommodation Blk (3)

Project name : Shifting of 500Te Accommodation Unit
Location         : Shifting from Buffer Zone to Quay 3, Keppel Shipyard
Period         : August 2008 to September 2008
 
 Cargo to be Transported: 

- 1 unit 500 Tons
  Accommodation Unit


 

Shifting of E-House (2)

Project name : Sea transportation of cargo from TOE, Loyang
Location         : Jurong Shipyard
Period         : 04 每 05 Sep 2011

Cargo 

-  E House 每 Wt: 408 Tons Dim: L 12.53 x W 12.53 x H : 14.58m


 

Shifting of Modules for FPSO(SBM) (9) More..

Project name : Shifting of Modules for FPSO(SBM)
Location         : Dyna-Mac Shipyard Singapore
Period         : October 2007 - July 2008
 
 
Cargo

- Module 2/9/10 - 500 Tons
- Module M1/M2 - 1,000 Tons

Supply Of Equipment

- 3 units 21 Axle lines Goldhofer PST/THP trailer


 

Terex Mining (1)

OVERSIZED & HEAVYLIFT

Client name : Terex Mining
Year                 : 2005


 

Transportation of Module within P.T. Profab Indonesia (1)

OVERSIZED & HEAVYLIFT
 
Project name         : Transportation of 2 units Module within P.T. Profab yard
Contractor                 : Yew Choon Pte Ltd
Location                 : P.T. Profab Yard, Batam
Country                 : Indonesia
Operation period         : 23th October 2003 to 5th November 2003

Cargoes to be transported :  

- 1 unit Module 3 A 
  ( Dim : 29.00 x 13.00 x 10.00 每 957 Tons ) 
- 1 unit Module 8 A 
  ( Dim : 16.00 x 7 .00 x 26.00 每 590 Tons )

For 957 Tons Cargo 
 

Transportation of Riser Gantry Crane (5) More..

Project name : Transportation of Riser Gantry Crane
Location         : Singapore
Period         : June 2009
 
Cargo
- 11 unit Riser Gantry Crane 每 175 Tons
- Dim: L33.014 x W8.606 x H17.365m