Alstom-Keppel Merlimau Cogen (12) More..

Project name     : Keppel Merlimau Cogen Plant
Year                  : 2005

Cargo Transported:

- Generator L12.42 x W4.16 x H4.44m - 333 tons
- Thermal block L11.18 x W5.40 x H5.23m - 343 Tons
- Transformer L8.50 x W3.50 x H5.90 - 160 Tons

Barges Used:

- Yew Choon Marine 5 (200' x 60' x 12')
- Yew Choon Marine 6 (180' x 50' x12')

Trailer Configuration:

12 (1+1/2) axleline hydraulic trailers

 

Muata Tawar Power Station (1)

Project name     : Installation of Steam Turbine Generator
Location            : Jakarta Indonesia
Year                  : August 2010

Cargo :     

- 140Te Generator

In the middle of August 2010, Yew Choon has installed a 140Te Generator at the Muara Tawar Power Station, Jakarta, Indonesia.
For this installation, the SBL1100 4-Point Lift System was utilized.
The installation came with some exciting engineering challenges due to the space restrictions in all directions.
The whole setup/ installation and dismantling of the SBL1100 was completed in 2 days.

 

Sri Lanka 300MW CCPP KERAWALAPITIYA (2)

Project name     : 300MW CCPP
Location            : Kerawalapitya, Sri Lanka
Year                  : January 2008 to April 2009

Cargo :     

- Gas Turbine (204.39 Tons)
   L11.2 x W5.06 x H5.06
- Generator (175.79 Tons)
   L9.15 x W3.94 x H3.61
- Steam Turbine ( 136.0 Tons)
   L10.4 x W4.9 x H4.3
- Auxiliary Module ( 54.0 Tons)
   L8.4 x W3.65 x H4.15
- Exhaust Plenum (15.0 Tons)
   L5.3 x W4.85 x H3.5
- Main Transformer GT 130 MVA (112 Tons)
   L7.55 x W3.15 x H4.2
- Main Transformer ST 140 MVA (117 Tons)
   L7.55 x W3.15 x H4.2
- HRSG Modules (100 Tons)
   L27.0 x W3.5 x H3.5

Supply Of Equipment  
   
- Tug    : Yew Choon 6 (1700 hp)
- Barge :  NY IV(L180' x W50' x H12')
              Yew Choon Marine 6(L180' x W50' x H12')
- Supply of local units assist tug
- Supply of lashing equipments
- Supply of Ro-Ro equipment
- Supply of Jacking equipment
- Supply of support beam / cross beam

 

Sri Lanka Lakdhanavi Power Station (1)


POWER STATION

Project name                          :    100 MW Furnace Oil Operated Medium Term Power Project at Puttalam Transportation and installation of Heavylit                                                           (Engines,Generators and Transformers) From Colombo Port to Puttalam Power Station
Location                                :     Colombo Port to Puttalam Power Station
Country                                 :    Sri Lanka
Cargoes to be transported     :     6 units    18V46 Engine
                                                   (Dim: 13.60x4.20x6.10m - 280 Tons each)
                                                   6 units    Generator
                                                   (Dim:L4.60xW4.10xH4.50m - 77 Tons each)
                                                   2 units    Transformer
                                                   (Dim:L5.00xW3.60xH4.30m - 62 Tons each)

Equipments to be supplied   

:       1 unit        200'x60'x121 barge     6   pcs      Wedge
        1 unit        2400 BHP Tugboat     47 pcs      Cross beam
        18 axlelines     Goldhofer            12 pcs       Concrete block
        2 units    Prime mover                 4   pcs       Support
        3 pcs        Ro-ro ramp                 50 pcs        Steel plate
        2 units     20' & 40' Contr            2  pcs        Counter weight
       (Jacking equipments)                   1  pc          Coupling beam
    
Operation period    :     14.1.04 - 21.3.04

Received Cargoes On Barge.
Received Cargoes On Barge.