Inner Ring Road Project (11) More..

Project name     : Inner Ring Road Project
Year                  : 2005 - 2006

Cargo Transported:     

- Deck Units 36.50 x 15.00 x 5.00 - 500tons

Total Units: 

60

Barge Used:     

NY IV(180' x 50' x12')

Trailer Configuration:     

Total of 36 axle lines Goldhofer PST/THP were used for this project
Connection Box: 2 sets of 9 axle lines Goldhofer PST/THP trailer
Closure Unit: 12 axle lines Goldhofer PST/THP trailer

 

Ratchaburi 1400MW CCPP (14) More..

Project name     : RPCL 1400MW CCPP
Location            : Ratchaburi, Thailand
Year                 : January 2007 to October 2007

 

Skidding Tanks On Ship (1)

Project name : Skidding Tanks on Ship
Location         : Sattahip Port, Thailand
Year                 : June 2010
 
Cargo :

-110Te 4 units Washing Tanks
   
In May 2010, the Singapore Office  was approached by one of our client to supply skidding material and provision of supervision for the skidding works of 4 units washing tanks on board of one of Jumbo¡¯s Heavy Lift ships.The Tanks had to be loaded at Sattahip Port Thailand by ships crane.
Due to the capacity of the ships cranes the tanks could only be placed on the center of the ship, the solution is to load all 4 tanks and  to skid them evenly on the deck.After loading, the vessel set sail to Papua New Guinea.  On arrival in PNG, the reversed process carried for offloading.   
Concurrently, Yew Choon is also awarded another related job by the manufacturer of the tanks for transporting the tanks from the storage area at Sattahip Port along side the ship.A double 12 axle lines Goldhofer SPT trailer was used

Transport of Tanks by Double Wide 12 Axle SPT Trailer


 

TTM - Thai Trans Malaysia (13) More..

Project name     : TTM(Trans Thai Malaysia) Gas Separation Plant 1
Year                  : 2004 - 2005

Cargo Transported:

- Absorber - 2 Units - 45.00 x 4.40 x 4.80m - 490 Tons each
- De-ethanizer column - 1 Unit - 41.00 x 3.70 x 4.10m - 145 Tons
- Stripper - 2 Units - 48.50 x 4.00 x 4.80m - 69 Tons each
- LPG Column Absorber - 1 Unit - 33.50 x 2.50 x 2.50m - 29 Tons

Barge Used:

- 3 Units of 180' x 50' x12')

Trailer Configuration:

Total of 36 axle lines Goldhofer PST/THP were used for this project